EasyManua.ls Logo

GE Senographe DS

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 9 Page no. 824
SC-PDR-A-001.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Scenario PDR A001 - Post-D/R Procedures
2-2-3 Sensor Tube Thermal Cut Out
The following calibrations and checks must be performed after replacement of this component:
Calibrations - Checks Job Card
Tube Tilt Calibration Job Card CAL A027 - Tube Tilt Calibration on page 1681
Collimator Calibration Job Card CAL A029 - Collimator Format Calibration on page 1683
Collimation Check Job Card ELE A028 - Collimation Checks on page 679
If Collimation Check not OK, repeat Collimator Calibration
Bad Pixel Calibration Job Card CAL A041 - Bad Pixel Calibration on page 1693
Gain calibration Job Card CAL A043 - Detector Gain Calibration on page 1697
flat field tests Job Card ELE A032 – IQ Tools Flat Field Test on page 699
If IQ tests not OK, repeat all calibrations from Bad Pixel
Half Value Layer Job Card CAL A046 - Half-Value Layer Measurement on page 1703
Conversion Factor Job Card CAL A045 - Conversion Factor Measurement on page 1701
Use the same dosimeter as that used for CAL A046
AOP Calibration Job Card CAL A051 - AOP Calibration on page 1723
mAs non linearity Job Card CAL A053 - mAs Non-linearity Calibration on page 1725
AOP/SNR Check Job Card ELE A038 - AOP Mode and SNR Check on page 707
If AOP/SNR check not OK, repeat all calibrations from AOP Calibration

Table of Contents

Other manuals for GE Senographe DS

Related product manuals