EasyManuals Logo

Hitachi IJ UX Service Manual

Hitachi IJ UX
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #202 background imageLoading...
Page #202 background image
5-8
Take up the shutoff valve(MV9), remove the makeup
in joint and remove the shutoff valve (MV9).
When the O-ring (P2.2) is remained at the
heating unit, remove it.
(1)Put the MV9filter, O-ring3.9, O-ring2.2and O-ring1.7 into the respective holes
of the joint part.
Perform the assembly after dipping the O-ring in makeup, and
confirm that the O-ring does not jump out of the hole.
(2)Connect the makeup IN joint to the shutoff valve
and fix it to the boss on the heating unit.
(3)Put the makeup in joint in the groove of MGV holder.
(4)Attach the MGV holder and fix the shutoff valve.
(5)Put the MV9filter, O-ring3.9,nozzle-In-joint and nozzle-In joint presser foot.
(6)Assemble the shutoff valve connector.
(7)Spurt ink after the assembly and confirm that there is no leak from
each terminal area.
(8)Attach each cover.
MV9
G9 filter
O-ring 3.9
O-ring 1.7
Makeup in joint
Nozzle-In joint
O-ring 2.2

Table of Contents

Other manuals for Hitachi IJ UX

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi IJ UX and is the answer not in the manual?

Hitachi IJ UX Specifications

General IconGeneral
BrandHitachi
ModelIJ UX
CategoryPrinter
LanguageEnglish

Related product manuals