6-74
6.5.18 No ink suction from gutter.
Execute the “Recovery line
Replace the recovery filter.
Is the tube of recovery
line or exhaust line folded?
Clean the gutter and gutter
Replace the tube or clean
Replace the recovery pump.
“Recovery line operation check”
This operation is the work for checking for ink clogging.
The operational procedure equals to operating in the sequence of Pump→MV3 on “Valve/Pump test”
Low volatilization system is disabled.
Refer to “4.20 Cleaning of
dedicated path for Low
volatilization system (UX-E
only)”.
Replace the Exhaust filter.
Replace the PTFE filter F20-8.8
Replace the print head
(UX-E only)