6-43
6.2.27b (N2)Circulation Route Pressure Is High
< Occurrence condition of this alarm>
This alarm Circulation Route Pressure Is High is indicated when the ink pressure is NOT reduced
at MV25 opening step while the sequence , or below is executed and the ink is being ejected.
Ink Eject Sequence A
Ink Eject Sequence B
Ink Circulation Sequence
Circulation Route
Pressure Is High
Replace MV25 or clean any ink buildup or
other foreign matters.
Replace the circulation pump.
Press Nozzle backwash2 button and then
Start/Continue button on Circulation Control
screen and sprinkle makeup over the tip of the
nozzle.
Does the MV25 operate?
Yes
No
Does the fault recur?
Yes
No
Is makeup suctioned?
Yes
No
Resume the
operation.
Press Operation test button of Viscometer calibration
screen and confirm that ink flows to the viscometer from
the Main ink tank.
Does ink flow to the
viscometer from the Main
ink tank?
Yes
No
Does the fault recur?
Yes
No
Replace the print head*1.
(*1) When you replace the printhead, refer to
“4.13 Print Head Replacement
Procedure”.
[Caution]
Be sure to check that there is no wrong
connection of harnesses by referring to
[Connector numbers and Identifying method of
harnesses]
in
“3.3.20 Electrical Connection
Diagram”.