EasyManua.ls Logo

HP Proliant DL580 - Chapter 8 Installing the Server in a Rack

HP Proliant DL580
289 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Installing the Server in a Rack
This chapter provides the required procedures for mounting an HP ProLiant DL580
Generation 2 server into a Compaq branded or industry-standard 19-in rack. For more
information, refer to Chapter 4, “Planning the Server Installation.” Server cabling and
configuration are discussed in Chapter 10, “Server Configuration and Utilities”and
Appendix D, “Cabling Guidelines.”
This chapter specifically addresses:
Server installation overview
Preparing the rack for server installation
Measuring with the rack template
Installing the rack rail assemblies
Preparing the server for rack installation
Attaching the server rails
Removing the power supplies
Installing the server into the rack
Loading the server into the rack rails
Attaching the cable management system reel assemblies
Reinstalling the power supplies
Securing the server in the rack for shipping
Connecting the AC power cord and peripheral devices
Securing cables with the cable management harness
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide 8-1
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM

Table of Contents

Other manuals for HP Proliant DL580

Related product manuals