EasyManua.ls Logo

HP Proliant DL580 - Attaching the Cable Management Arm to the Server

HP Proliant DL580
289 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the Server in a Rack
4. Attach the cable management arm to the round-hole rack, and then secure the
thumbscrews (2).
Figure 8-17: Attaching the cable management arm to
the round-hole rack
Attaching the Cable Management Arm to the Server
1. Loosen the thumbscrews on the front of the server to enable the server to slide
forward.
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide 8-21
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM

Table of Contents

Other manuals for HP Proliant DL580

Related product manuals