EasyManua.ls Logo

HQ Pro-sTitcher - C-Pod Replacement (HQ Sixteen Only)

HQ Pro-sTitcher
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
09/01/133.22 | Installaon www.HandiQuilter.com
C-Pod Replacement (HQ Sixteen only)
Some kits will come with a new C-Pod. If the HQ Sixteen was purchased with the HQ Pro-Stcher, there is
no need to install a new C-Pod. Also, any HQ Sixteen stch-regulated system running version 8.04 or later
does not require a C-Pod upgrade. e C-Pod screen identies the version as it boots up.
CAUTION: To prevent damage due to electrostac discharge, use a grounded wrist strap. If a wrist
strap is not available, discharge any electrostac energy on your body by touching any exposed
metal (non-painted) poron of the HQ Sixteen prior to and several mes during this procedure.
1. Remove the C-Pod from the HQ Sixteen head by removing the four mounng screws with a Phillips
screwdriver.
2. Carefully disconnect all cables from the C-Pod, taking care not to touch the bare circuit board.
3. If the new C-Pod includes a Lock Board, skip ahead to
step 7.
4. Remove the black Phillips screw that holds the lock board in place on the old C-Pod circuit board.
5. On the old C-Pod (the one just removed from the
HQ Sixteen), gently pull upward on the lock board to
remove it from the old C-Pod and press it rmly in
place on the new C-Pod. Make sure both rows of pins
enter the header on the underside of the Lock Board.
The red LED should be located at the top right when
looking into the C-Pod.
6. Lightly hand-ghten the black Phillips screw through the Lock Board.
7. Aach the internal cables to the new C-Pod.
8. Fasten the C-Pod to the head using the four screws that were removed in step 1.
Lock Board
!

Table of Contents