Table 33. Determining when to run the battery calibration procedure (continued)
Scenario If you are...
Perform this procedure
on...
3 installing a new clustered TS7650 AP1 (appliance) in
accordance with the IBM System Storage TS7650
ProtecTIER Deduplication Appliance Installation Roadmap
Guide, IBM form number GA32-0920
Server A first and
Server B second
4 installing a new clustered TS7650G (gateway) in
accordance with the IBM System Storage TS7650G
ProtecTIER Deduplication Gateway Installation Roadmap
Guide, IBM form number GA32-0921
Server A first and
Server B second
5 upgrading an existing stand-alone TS7650 AP1
(appliance) to a cluster in accordance with the IBM
System Storage TS7650 ProtecTIER Deduplication
Appliance Increasing Capacity and Changing to Clustered
Configuration Upgrade Installation Instructions
Server B only
6 upgrading an existing stand-alone TS7650G (gateway)
to a cluster in accordance with the IBM System Storage
TS7600 with ProtecTIER Stand-alone TS7650G to
Clustered TS7650G MES Installation Instructions for the
Cluster Connection Kit, FC 3437
Server B only
Note: It can take up to 24 hours for a learn cycle to complete.
About this task
Calibrating the server battery is desirable, but not required, before turning the
system over to the customer.
Procedure
Perform the following steps to calibrate the server battery.
1. Determine whether a learn cycle is active on the server by typing the following
command at the server command line:
/opt/MegaRAID/MegaCli/MegaCli64 -AdpBbuCmd -GetBbuStatus -aAll
and pressing Enter.
Information similar to the following example displays. The bold item shows
whether a learn cycle is active.
Chapter 6. Enabling ProtecTIER RAS functions 95