Section E - Hydraulics
Loader Pumps
Loader Pump - High-flow Machines
E - 78 E - 78
9803-9450-2
Loader Pump - High-flow Machines
Dismantling and Assembly
Fig 68.
The numerical sequence shown on the illustration is
intended as a guide to dismantling K
Fig 68. ( T E-78).
For assembly the sequence should be reversed.
Dismantling
Clamp pump in a vice with shaft end upwards.
Mark all parts to ensure correct alignment when
assembling. Discard all seals and sealing rings.
Clean all parts in light kerosene, examine for damage and
wear.
Inspection
As the only parts available are those contained in the seal
kit, a new pump must be fitted if any of the following parts
are excessively worn.
Gears and Shafts
Check shafts at seal and bush areas for roughness or
excessive wear.
Check gear faces for scoring and excessive wear. If edges
of gear teeth are sharp, dress with emery cloth.
C044010
1
B
13
121110986 75432
15 16 17 18 19 20 21 22 23 24 2514