MX10004 Site Preparaon Checklist
The checklist in Table 28 on page 80 summarizes the tasks you must perform to prepare a site for the
MX10004 router.
Table 28: MX10004 Site Preparaon Checklist
✓ Item or Task For More Informaon
Environment
□ Verify that environmental factors such as temperature
and humidity are within router tolerances.
See "MX10004 Environmental Requirements
and Specicaons" on page 81.
Power
□ Measure the distance between external power sources
and the router installaon site.
□ Calculate the power consumpon and requirements. See "MX10004 Power Planning" on page 88.
Rack
□ Verify that your rack meets the minimum requirements
for router installaon.
See "MX10004 Rack Requirements" on page
84.
□ Plan rack locaon, including required space clearances for
opmal airow.
See "MX10004 Clearance Requirements for
Airow and Hardware Maintenance" on page
87.
□ Secure the rack to the oor and the building structure.
Cables
80