EasyManua.ls Logo

Kodak Dryview 5800 - Page 144

Kodak Dryview 5800
328 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-8 2G0947 - 31JAN08
Preventive Maintenance
19. Clean and inspect:
PROCESSOR COVER ROLLERS
HEAT SHIELD SUPPORT BARS
DENSITOMETER GUIDE
DENSITOMETER GUIDE ROLLERS
20. Vacuum:
TOP COVER
FRONT PANEL
entire PROCESSOR AY
21. Remove the used piece of film from the top of the OPTICS AY.
NOTE: Be careful not to spill loose debris resting on top of the film. Discard
the film and debris.
22. Install:
PROCESSOR DRUM
RIGID DUCT
IMPORTANT:
Install a new FELT PAD AY every PM (20,000 cycles) and a new FILM
DIVERTER AY every other PM (40,000 cycles).
PROCESSOR COVER
ROLLERS
DENSITOMETER GUIDE
ROLLERS
2 HEAT SHIELD
SUPPORT BARS

Table of Contents

Other manuals for Kodak Dryview 5800

Related product manuals