EasyManua.ls Logo

LELY Vector - Maintenance Procedures; Preventive Maintenance Schedule Farmer

LELY Vector
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.2011.8583.0 C
Maintenance Procedures 6-1
6 Maintenance Procedures
6.1 Preventive Maintenance Schedule Farmer
The following table shows the preventive maintenance schedule for the Vector. Preventive maintenance
must obey all applicable local regulations.
The frequencies of the tasks shown in the table are the minimum frequencies
recommended.
Table 1. Maintenance
Task
Day
Examine the stock (see Examine the Stock on page 6-23)
1
Sweep the feed kitchen and remove spilled feed
1
Correct the number of animals in the group see Horizon
1
Examine the Feeding, see reports Horizon
1
Fill the feed kitchen (see Fill the Feed Kitchen on page 5-27) 3 (or more
often)
Clean and Inspect the Feed Loading location (see Clean and Inspect the Feed Loading
Location on page 6-2)
7
Examine and repair the metal strips (see Examine and Correct the Metal Strips on page
6-17)
7
Clean the feed height sensor on the Mixing and Feeding Robot
7
Clean the ultrasonic sensor (see Clean the Ultrasonic Sensors on page 6-7)
14
Clean the feed height sensor on the Feed Grabber
14
Clean the pipe to the drop pipe of the additives dispenser (frequency pulse) (Option)
(see Clean the Drop Pipe of the Additives Dispenser(s) (freqency pulse) on page 6-23)
14
Clean the position sensor of the dosing roll (see Clean the Dosing Roll and Position
Sensor on page 6-3)
14
Examine the reports on the Mixing and Feeding Robot Software (see Examine the
Reports in the Mixing and Feeding Robot Software on page 6-19)
14
Clean the magnet on the Mixing and Feeding Robot (see Clean the Magnets on page 6-
4)
14
in n o vato rs in agriculture

Table of Contents

Related product manuals