EasyManua.ls Logo

Lucent Technologies MERLIN LEGEND Release 6.1 - Powering down the System

Lucent Technologies MERLIN LEGEND Release 6.1
355 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MERLIN LEGEND Communications System Release 6.1
Installation
555-661-140
Issue 1
August 1998
Installing the Control Unit
Page 2-46
Powering Down the System
Powering Down the System
You may need to power down the system for troubleshooting during
installation, or to add new equipment to the carrier.
!
CAUTION:
Follow these steps in the exact sequence.
To power down the system, follow the steps below.
!Turn off the power supply on the basic carrier.
!Turn off the power supplies on the expansion carriers.
!Unplug any auxiliary power units.
Because the power supplies are already off, the sequence for removing
auxiliary power cords is not important.
!Unplug the system from the AC outlet.

Table of Contents

Other manuals for Lucent Technologies MERLIN LEGEND Release 6.1

Related product manuals