EasyManua.ls Logo

LUMAT LB 9507 - 3. Getting Started; 3.1 Instrument Setup; 3.2 Power Supply; 3.3 Checking the Paper Supply

LUMAT LB 9507
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LB 9507 Chapter 3: Getting Started
3-1
3. Getting Started
3.1 Instrument Setup
The place where the instrument is set up should have the
following characteristics:
- free of dust
- no strong magnetic fields
- no direct exposure to sunlight
- ambient temperature +15 - +30°C
- relative humidity 10 - 90 %, no condensation
- power supply as specified on the type label
- distance of rear panel from the wall at least 10 cm to provide
the necessary cooling
- operation area above the instrument at least 20 cm
- firm, smooth surface leaving the air filter inlet open
3.2 Power Supply
A selection of the line voltage is not necessary. The
multi range power supply will detect the line voltage
automatically , only make sure that the correct line fuse
is fitted.
1 Amps slow blow for 230 V
2 Amps slow blow for 115 V
at a frequency of 47 - 62 Hz.
Use only the cable supplied with the instrument to
connect it to the mains!
3.3 Checking the Paper Supply
Check if the paper supply is sufficient; for changing paper see
section 13.1.

Table of Contents