2. Align the holes in the extended upper boom point butt
with the holes in the boom top and install the connecting
pins (see View B). Install blocking under the top of the
upper boom point butt.
3. Lift the top of the extended upper boom point into
position at the top of the upper boom point butt.
4. Attach the extended upper boom point to the upper
boom point butt.
NOTE: The butt and top sections have FACT™
connectors:
The top connectors are joined by fixed vertical pins
that hook into holes in the adjacent section
(see View C).
The bottom connectors are joined by removable
horizontal pins (see View E).
5. Make sure that the pin heads on top are facing toward
the outside.