EasyManuals Logo
Home>Manitowoc>Construction Equipment>2250

Manitowoc 2250 User Manual

Manitowoc 2250
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
Reference Only
INTRODUCTION 2250 OPERATOR MANUAL
1-2
Published 06-24-16, Control # 241-01
IDENTIFICATION AND LOCATION OF COMPONENTS
Crane Components
A1048
19
2
4
5 (both ends)
1
18
21
22
9
13
12
14
11
3
77
15
16
6 (both ends)
810
20
17
Item Description
1 #44 Heavy Lift Boom
2Operator’s Cab
3 Boom Butt Handling Cylinder
4 Rotating Frame Adapter
5 Carbody Counterweight (both ends)
6 Step (both ends)
7 Jacking Cylinders (qty 4)
8 Carbody (undercarriage)
9 Crawler (both sides)
10 Rotating Bed
11 Upper Counterweight
12 Backhitch Gantry (telescopic)
13 Gantry
14 Boom Stop
15 Equalizer
16 Wire Rope Guide (boom butt)
17 Boom Straps
18 Wire Rope Guide (boom top)
19 Upper Boom Point
20 Lower Boom Point
21 Weight Ball
22 Load Block
23 Fixed Jib
24 Jib Stop
25 Jib Strut
26 Backstay Pendant
27 Jib Pendant
28 Jib Point
25
28
21
23
24
26
27
FIGURE 1-2

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals