Manitowoc Published 06-24-16, Control # 241-01 4-131
2250 OPERATOR MANUAL SETUP AND INSTALLATION
4
10-Part Continuous Reeving
A791
Front Drum
Rear Drum
Lower Boom
Point Sheaves
Rear View
Boom Top
Guide Sheaves
Rear View
Front Drum
Rear Drum
1234567895
Center
Guide Sheaves
over Boom Point
Sheaves 4 and 6
Boom Butt
Guide Sheaves
Rear View
NOTE 1: Hand position the clamps tight against the bearing.
Before tightening bolts, make sure the sheave turns
freely. Tighten the bolts lubricated with SAE 20 oil to
163 Nm (120 ft-lb).
Tighten each side equally to provide an
equal gap. See NOTE 1 for torque value.
Clamp
Bolt
Nuts
Lock Washer
A616
A1209
MCC 9-Sheave
Load Block
Lower Boom
Point Sheaves
Boom Top
Guide Sheaves
4
6
10-Part Continuous Reeving
over Lower Boom Point
Crane Equipped with:
• 66.68 in Wide Drums
• 1-1/4 in Diameter Wire Rope
• Drum Laggings Removed
Rear Drum
Front Drum
FIGURE 4-75

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals