EasyManua.ls Logo

Manitowoc 2250 - 10-Part Continuous Reeving

Manitowoc 2250
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 06-24-16, Control # 241-01 4-131
2250 OPERATOR MANUAL SETUP AND INSTALLATION
4
10-Part Continuous Reeving
A791
Front Drum
Rear Drum
Lower Boom
Point Sheaves
Rear View
Boom Top
Guide Sheaves
Rear View
Front Drum
Rear Drum
1234567895
Center
Guide Sheaves
over Boom Point
Sheaves 4 and 6
Boom Butt
Guide Sheaves
Rear View
NOTE 1: Hand position the clamps tight against the bearing.
Before tightening bolts, make sure the sheave turns
freely. Tighten the bolts lubricated with SAE 20 oil to
163 Nm (120 ft-lb).
Tighten each side equally to provide an
equal gap. See NOTE 1 for torque value.
Clamp
Bolt
Nuts
Lock Washer
A616
A1209
MCC 9-Sheave
Load Block
Lower Boom
Point Sheaves
Boom Top
Guide Sheaves
4
6
10-Part Continuous Reeving
over Lower Boom Point
Crane Equipped with:
66.68 in Wide Drums
1-1/4 in Diameter Wire Rope
Drum Laggings Removed
Rear Drum
Front Drum
FIGURE 4-75

Table of Contents

Other manuals for Manitowoc 2250

Related product manuals