2250 OPERATOR MANUAL OPERATING CONTROLS AND PROCEDURES
3
Dome Light
FIGURE 3-1 continued
Drum (the number identifies
which drum is in use)
Drum (free fall)
(with drum number)
3
OR
3
3
OR
3
Drum (lower load, boom,
luffing jib, or mast—depends
on drum use)
Drum (raise load, boom,
luffing jib, or mast—depends
on drum use)
Drum Pawl
Drum (split)
Data (enter)
Data (save entered)
Cylinders (gantry)
Cylinder (boom)
Cylinders (jacking)
Extend or Retract
Decrease/Increase
Cylinders (jacking)
Cylinder Location
Right Front
Left Rear
Right Rear
All
Left Front
Crawler Travel Speed (low)

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals