Grove Published 02-21-2019, Control # 611-05 3-103
TMS9000-2 OPERATOR MANUAL OPERATING CONTROLS AND INDICATORS
Main boom length display
Telescopic sections display
Refer to Pre-selection for all telescopic sections.
Current telescope status display
Extended length of the telescopic sections in percentage
Pre-selection for all telescopic sections
Pre-selection individual telescopic sections
Teleautomation direction display
Confirm pre-selection
Display:
Current extended length of the main
boom (Figure 3-148)
Unit of
measurement:
Displayed depending on setting, m
(meters) or ft (feet)
1 - 5
Display of telescopic sections 1 to 5
(Figure 3-149)
1 - 5
Display of telescopic sections 1 to 5
(Figure 3-150)
1 Pre-selection telescoping 0%
2 Pre-selection telescoping 50%
3 Pre-selection telescoping 92%
4 Pre-selection telescoping 100%
1 - 5
Display of telescopic sections 1 to 5
(Figure 3-149)
1 Start telescoping with Retract (Figure 3-151)
2 Start telescoping with Extend
1
Confirm request to use entered telescoping values
(Figure 3-152)
2
Once a new set of values are entered for telescoping,
the question-mark appears until the OK is confirmed.
Then the check-mark or the red-X is shown