EasyManua.ls Logo

Manitowoc Grove TMS9000-2 Series - Page 256

Manitowoc Grove TMS9000-2 Series
430 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING PROCEDURES TMS9000-2 OPERATOR MANUAL
4-46
Published 02-21-2019, Control # 611-05
Use the buttons (2) or (3) to select the required
counterweight combination, e.g. 21.0 klb.
Confirm the selection.
Boom system
Select and confirm the symbol (1, Figure 4-54).
Use symbol (1, Figure 4-54) to select the rigged boom
system.
Confirm each selection.
Outrigger span display
Depending on the equipment of the truck crane, the outrigger
span (Figure 4-55) is shown in meters, feet or percent (%).
Outrigger span
Select and confirm the symbol (1, Figure 4-55).
Use the buttons (2) or (3) to select the rigged outrigger
span.
Confirm the selection.
Press the extend/retract button (1, Figure 4-56) to
deploy the outriggers to the desired position.
8849-33a
FIGURE 4-53
8882-28b
1
1
FIGURE 4-54
5
8882-28a
2
3
4
1
2 Main boom
3 Main boom with lattice extension
4 Angle of the manual lattice extension
5 Length of lattice extension
9084-1
FIGURE 4-55
1
8849-36a

Table of Contents

Related product manuals