EasyManua.ls Logo

Mitsubishi GOT1000 GT15 - 7.2 Wiring to GOT Power Section

Mitsubishi GOT1000 GT15
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 - 4
7.2 Wiring to GOT Power Section
7.2 Wiring to GOT Power Section
This section provides an example for connecting power cables and ground cables to the power terminals
situated on the back of the GOT.
AC
(LG) (FG)
(LG) (FG)
INPUT
100-240VAC
GOT
GOT
INPUT
24VDC
AC
DC
Fuse
100/110V AC
24V DC
In the case of 100V AC
+
-
(FG)
GOT
INPUT
24VDC
Ground cables
Grounding
+
-
In the case of 24V DC
(GT1595,
GT1585,
GT157 ,
GT156 )
In the case of 24V DC (GT155 )

Table of Contents

Related product manuals