Training Guide Course No. 196514
Level 2 Maintenance, X-1000 Series Dispensing Systems 2-21 P/N 196515 (Revision A)
Lesson 2-3
Power Distribution
A. Introduction
AC power enters the dispensing system from the facility power source at the Main
Power Inlet. From there, it runs through the Main Circuit Breaker to the Power
Manager. The Power Manager supplies power directly to several system
components, which in turn distribute power to other components. The Power
Manager is switched ON and OFF by the Start, Stop, and EMO buttons on the
Operator’s Console and by the main circuit breaker on the back of the machine.
B. Enabling Objective
2.3 Explain the X-1000 Power Distribution.
C. Topic Outline
1. Introduction
2. Overview
 Power Manager
 Main Interface PWA
 XY Servo Interface
 Computer Power Supply
 Conveyor Controller
3. Summary and Review