Training Guide Course No. 196514
Level 2 Maintenance, X-1000 Series Dispensing Systems 5-5 P/N 196515 (Revision A)
Lesson 5-2
Removing and Replacing Conveyor Belts
A. Introduction
To maintain reliable system performance, it is recommended that the Conveyor
Belts be changed every six months. However, the belts may need to be changed
more frequently or less frequently, depending upon the volume of part handling.
B. Enabling Objective
5.2 Perform the procedure to remove and replace conveyor belts.
C. Topic Outline
1. Introduction
2. Overview
 Removing a Conveyor Belt
 Installing a Conveyor Belt
3. Summary and Review