EasyManuals Logo

PP Systems CIRAS-3 User Manual

PP Systems CIRAS-3
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
CIRAS-3 Operation Manual V. 1.09 46 support@ppsystems.com
There are two major factors influencing battery capacity:
Environmental control
CFM-3 Chlorophyll Fluorescence Module
For field use, it is extremely important to make sure that the internal battery(s) are fully charged.
We also offer a nice, lightweight external battery pack that can clip easily to your belt for extended
operation time in the field. See External Battery Pack (For extended operation in the field) on page 180
for more details.
If you have an older CIRAS-3 system using the old battery pack (Aved type) and are interested in
updating your system to the latest battery technology (Inspired Energy) please get in contact with PP
Systems.
Battery Pack Installation
When systems are first supplied the batteries are packed inside the CIRAS-3 console in “Ship Mode”.
Upon receipt of your new instrument you must remove the packs from each compartment to put them into
“Run Mode” as shown below.
Ship Mode
Run Mode

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PP Systems CIRAS-3 and is the answer not in the manual?

PP Systems CIRAS-3 Specifications

General IconGeneral
BrandPP Systems
ModelCIRAS-3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals