EasyManua.ls Logo

PP Systems CIRAS-3 - Section 6. Startup Routine and System Stability Checks; Before You Power Up CIRAS-3

PP Systems CIRAS-3
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CIRAS-3 Operation Manual V. 1.09 66 support@ppsystems.com
Section 6. Startup Routine and System Stability
Checks
Before You Power Up CIRAS-3
The time required to be up and running from when you power on CIRAS-3 to when you make your first
measurement is reasonably short. Much of the pre-operation phase depends on the how well you
maintain chemicals. But there are a few other important considerations. The most basic pre-operational
checklist can be summarized by these items:
Be sure that the chemicals are fresh and not exhausted.
Check that the leaf chamber gaskets are in good condition and replace them if they are
compressed, damaged, or dirty.
Be sure there is sufficient battery power for field operation. For optimal performance, we
recommend charging the internal CIRAS-3 Li-ion battery(s) the night prior to field
measurements using the power supply adapter provided. The indicating LED on the
CIRAS-3 console will be a steady green when connected to the charger/power supply.
The actual state of the battery can be viewed in the lower right hand corner of the display
when powered on.
Make all necessary electrical connections of cuvettes, accessories and other components
If working at high ambient temperatures (>35-40
o
C), we recommend shading the console
to prevent overheating.
Keep the CIRAS-3 on its power supply adapter during warm up to preserve the battery.
If using a CO
2
cartridge, make sure that one is in place with enough capacity to get you
through your measurements. See CO2 Cartridge Status on page 68
.

Table of Contents

Related product manuals