EasyManuals Logo

PP Systems CIRAS-3 User Manual

PP Systems CIRAS-3
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
CIRAS-3 Operation Manual V. 1.09 31 support@ppsystems.com
Quick Start
We highly recommend that you take a few moments to run this simple test to A) familiarize
yourself with the basic CIRAS-3 set-up and operational functions and B) ensure that the system is
performing perfectly before starting any measurement campaign. The tutorial on the previous
pages is also highly recommended before your first measurement campaign.
1. Insert a new CO
2
cartridge, ensure all chemicals are fresh and connect the CIRAS-3 charger to
the CIRAS-3 main console (this will help to preserve the battery).
2. Connect the PLC3 Leaf Cuvette gas and signal connectors to the CIRAS-3 main console, close
the cuvette (with no leaf present) and press the CIRAS-3 On/Off switch to power up the system
and then Continue (F1).
3. Allow system to warm up for approximately 30 minutes. Press Settings (F2) and make sure that
that your Settings File and Accessory displayed are correct (change if necessary). Assuming that
you are using the PLC3 Universal Leaf Cuvette and PLC3 Universal LED Light Unit, set up as
follows and press Accept (F2):
To best simulate sunlight we recommend the following RGBW Control settings:
Red: 38%
Green: 37%
Blue: 25%
White: 0%
Give your system a couple of minutes to stabilize at the values that were set under Settings (F2). Once
stabilized, your display should look something similar to this.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PP Systems CIRAS-3 and is the answer not in the manual?

PP Systems CIRAS-3 Specifications

General IconGeneral
BrandPP Systems
ModelCIRAS-3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals