Done Step Section
Check location and position "Location" on page23.
Connect the water components of the
unit
"Connecting water components
(water installation)" on the facing
page.
Connect the electrical system "Connecting electrical
components" on page29.
Connect the acid tank (partially filled
with water) and then connect the acid
tank float
"Connecting acid dosing
components" on page29.
Vent the acid pump and pipes "Connecting acid dosing
components" on page29.
Install quartz tubes "Installing quartz tubes" on
page32.
Pressurize the unit, bleed the air out,
and check for leaks
"Pressurizing the unit" on
page36.
Install UV-C lamps "Installing UV-C lamps" on
page37.
Connect tank sensors "Requirements for installing
water tank sensors" on page24.
Link to Synopta (optional) "Connecting Synopta" on page40.
Fill acid tank with acid "Chemicals" on page21.
Check parameters "Check settings" on page44.
Program activation conditions "Appendix A:Control overview"
on page59.
Testing the unit
Disinfection "Manually start disinfection" on
page44.
Cleaning quartz tubes "Manually start cleaning quartz
tubes" on page46.
Filter flushing "Manually start filter flushing" on
page47.