8.3 Sequence control when switching the motor on and o
Overview
The sequence control denes the rules for switching the motor on and o.
5HDG\WRVZLWFKRQ
2SHUDWLRQ
2))21
Figure 8-3 Simplied representation of the sequence control
After switching the supply voltage on, the inverter normally goes into the "ready to start" state.
In this state, the inverter waits for the command to switch on the motor.
The inverter switches on the motor with the ON command. The inverter changes to the
"Operation" state.
After the OFF1 command, the inverter brakes the motor down to standstill. The inverter
switches o the motor once standstill has been reached. The inverter is again "ready to start".
Requirement
Functions
In order to be able to respond to external commands, you must set the command interface so
that it ts your specic application.
Tools
To change the function settings, you can use an operator panel or a PC tool, for example.
Advanced commissioning
8.3 Sequence control when switching the motor on and o
Distributed converter for SIMOGEAR geared motors
Operating Instructions, 10/2020, FW V4.7 SP13, A5E31298649B AL 159