STEERING
6C-12
Figure 6C-7. Metering Package Assembly
27.Install the o-rings (4) and seal ring (3) on the port
cover (2).
28.Install the needle rollers (5) in the port manifold
(6).
29.Install the port manifold (6).
30.Install the lock nuts (1). Tighten the lock nuts grad-
ually in sequence to 20-24 ft-lbs (27-33 Nm)
torque (Figure 6C-8).
Figure 6C-8. Alignment Grooves
1
2
3
4
5
6
7
8
9
STEPS 13, 14, 15
STEP 16
112
9
4
6
7
8
5
3
1
10