Chapter
JO
Disassembly and Reassembly
.::;3·;.;D=is:::a;;;;ss;;;e:::m;.;b:,:.lY::...;:3;,;n.::;d.;;R.:;e;;:a;;;ss;.;e;;:m;.;b;;;i;,;;.Y
_____________________
3,4JH3(B)(CJE
3-1,29
Remove
the
fuel
injection
pump
(1) Remove the blind plug mounted to the hub of the
automatic advancing timer
{2) Remove the box nut, and pull out the fuel oil pump
drive gear/automatic advancing timer assembly with
an
extraction
tool.
(3) Remove the fuel injection pump and O-ring from the
gear case flange.
Fuel
injection
pump
3-1.30
Removing
the
iding
gear
Remove the two hex bolts hoiding the idling the idling
pull out
the
idling gear and idling shaft.
Printed
in
japan
l!INSHl-!18009
10-21
3-1.31
Removing
the
pistons
and
connecting
rods
(1) Remove the connecting rod bolt and the large end cap.
{2) Push the connecting rod from the bottom and pull out
the piston connecting
rod
assembly.
@;\/)
~
,,3
Large
end
cap---
,
Connecting
rod
bolt
--£
NOTE : Place a tool against the piston cooling nozzle to
make sure the nozzle position does
not
change
and it does not get scratches.