EasyManua.ls Logo

Zebra 110XiIII Plus Series - Page 228

Zebra 110XiIII Plus Series
275 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13185L-002 Rev. A 1/24/06 110XiIIIPlus Maintenance Manual Page 4-123
Maintenance Section 4
Figure 4-84. Install the Printhead Test Board
4. Refer to Figure 4-85. Cut and discard the cable ties and unplug the printhead power
cable from the power supply (J3).
Printhead
Test Board
Mounting
Screws
Note • Make a note of all the wires and locations of the cable ties; you will have
to replace them later.

Table of Contents

Related product manuals