Step 4: Place the film, core and spool combination into the magazine.
Step 5: Thread the film through the light seal rollers at the bottom
of the magazine.
Step 6: Pull about 12 inches (30 cm) of film out of the magazine. This
is the
film
that
you
will
thread
through
the
body
of the
mod-
ule and into the take-up magazine.
Step 7: Close the magazine door.
Note: Steps 8 and 9 can be performed in subdued
room light.
Step 8: Prepare the end of the leader:
• Cut the end of the film as shown in Figure 2.
• Make a reverse bend at the end of the leader as shown in
Figure 2. The reverse bend makes it easier to feed the film
through the light seal rollers of the take-up magazine.
Step 9: Mount the feed magazine onto the module and feed the film
into the body of the module.
Caution:
Do not leave loaded feed magazines in brightly lit
areas for long periods of time.
Figure 2 Left, cut off the corners of the leader to make it easier to thread the film
through the camera module Right, make a reverse bend at the end of the leader to
make it easier to feed the film into the take-up magazine
PCR II Plus 35mm Bulk Load Camera Module • 7