NTP 106 — Install a B-2404-P business ONT
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02 November 2013 NTP 106-5
3FE 55873 AAAA TCZZA Edition 01
ONT Product Information Guide
10 Connect the B-2404-P to a UPS.
i Install the UPS according to the manufacturer instruction. Be sure to read
and follow all safety, installation, maintenance, and service instructions.
ii Verify that the power cable terminates with an 8-pin connector as shown in
Figure NTP 106-3 and described in Table NTP 106-1.
Figure NTP 106-3: 8-pin connector
Table NTP 106-1: Pin assignments on the 8-pin connector
iii Plug the optional 8-pin Molex output power cord in to the power connector.
11 Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
12 Activate and test the services (DLP 128).
13 STOP. This procedure is complete.
Pin # Definition Pin # Definition
1 Power input (+ 12V) 5 12 V power return
2 UPS status: On battery 6 Alarm ground
3 UPS status: Battery missing 7 UPS status: Replace battery
4 GNC / Optional frame ground 8 UPS status: Low battery
Pin 8 Pin5
Pin 4 Pin 1
21657