EasyManua.ls Logo

Allied Telesis AlliedWare Plus - Page 112

Allied Telesis AlliedWare Plus
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5: Installing AT-StackQS and AT-x9EM/XT4 Cards
112
14. If you purchased AT-StackQS Cards for other sx930 Switches, repeat
this procedure to install the cards.
15. Do one of the following:
To install the switch on a table, go to Chapter 6, “Installing the
Switch on a Table” on page 113.
To install the switch in an equipment rack, refer to Chapter 7,
“Installing the Switch in an Equipment Rack” on page 115.
To install the switch on a wall, refer to Chapter 8, “Installing the
Switch on a Wall” on page 121.

Table of Contents

Other manuals for Allied Telesis AlliedWare Plus

Related product manuals