EasyManua.ls Logo

Allied Telesis AlliedWare Plus - Figure 55: Installing the Switch in an Equipment Rack

Allied Telesis AlliedWare Plus
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7: Installing the Switch in an Equipment Rack
120
Figure 55. Installing the Switch in an Equipment Rack
4. Repeat this procedure if there are other switches to be installed in an
equipment rack.
5. Do one of the following:
If you have not installed the power supplies yet, go to Chapter 4,
“Installing the Power Supplies” on page 93.
If any of the switches contain the AT-PWR250-80 DC Power
Supply, go to Chapter 9, “Wiring the DC Connector on the AT-
PWR250-80 Power Supply” on page 137.
Otherwise, go to Chapter 10, “Displaying the AlliedWare Plus
Version Number” on page 141.

Table of Contents

Other manuals for Allied Telesis AlliedWare Plus

Related product manuals