EasyManua.ls Logo

Amada ML-5120A EU - Chapter 1 Installation

Amada ML-5120A EU
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Installation Place
43
ML-5120A
Chapter 1 Installation
Introduction Part
Installation and
Preparation Part
Operating Part Maintenance Part Appendixes
Chapter 1
Installation
This chapter explains where to install the laser equipment, and how to x it.
At installation of this laser equipment, our engineer will take charge of adjust-
ments. Accordingly, this Operation Manual does not describe the adjusting meth-
od at a startup. When the laser is transferred to another installation place, it may
be necessary for our engineer to perform inspection and re-adjustments.
1. Installation Place
The space required for installing the laser equipment and the environment suit-
able for the installation are explained below.
Install laser equipment in a sure place at a level with the ground surface. If the prod-
uct is operated in inclined or fallen form, a failure will occur.
For the power supply side, we earnestly recommend using a leakage breaker
with the rated current of 10 A or more, which is applicable to harmonics and surg-
es.
Perform class D grounding work (Ministry of Economy, Trade and Industry "Tech-
nical Standards for Electric Equipment").
Installation and
Preparation Part

Table of Contents