SmartROC D65 T4F 4 Daily checks
25 No: 713944459.6 en
4 Daily checks
4.1 Foreword
This chapter provides instructions for daily inspection and maintenance to be carried out by
the operator before each shift.
Regarding weekly inspections ad other maintenance tasks, see separate instructions
"Maintenance schedules".
4.2 Extra safety check
4.2.1 Safety
DANGER
Serious injury or death
Danger of moving parts
u Risk of serious personal injury
u Set all levers and switches in neutral position before preparing start-up
u Perform the extra safety check without the engine running
DANGER
Serious injury or death
The side hatches on the drill rig are not dimensioned for extra weight
u Risk of serious personal injury
u Standing, sitting or leaning on the side hatches can result in serious injury
u The side hatches must be closed when work is carried out on top of the rig
WARNING
Serious injury
Very high exhaust temperatures
u May cause serious personal injury and damage to property
u Always check that the rig is positioned so that fire or other damage cannot occur when
regeneration is in progress
Visual check
Before each shift starts an extra and thorough visual safety check should be carried out in
order to detect: