EasyManuals Logo

Avaya Definity User Manual

Avaya Definity
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #214 background imageLoading...
Page #214 background image
CVLAN System Administration
5-50 Issue 3 May 2002
CV/LAN Utilities — ASAI Test
Screen 5-34. ASAI Test
The above figure shows a sample output screen from the ASAI test CV/LAN utility.
Heartbeat with switch for ASAI node signal01 was successful.
Heatbeat with switch for ASAI node signal02 was successful.
Unexpected capability = C_ABORT for ASAI node signal03 received.
The capability expected was C_HB_CONF
Primitive type response for ASAI node signal03 !=C_POS_ACK
Primitive type response received = C_REQUEST
Heartbeat test with switch for ASAI node signal03 failed.

Table of Contents

Other manuals for Avaya Definity

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Avaya Definity and is the answer not in the manual?

Avaya Definity Specifications

General IconGeneral
BrandAvaya
ModelDefinity
CategoryServer
LanguageEnglish

Related product manuals