Operation
Instruction handbook b maXX BM3000, BM3200, BM3300
Document no. 5.11018.11
161
of 218
8
n Please, observe an EMC-compatible laying of the Ethernet connection cables!
n The following cables were released for use by Baumüller:
Ethernet connection cable;
Further information see ZCables - EtherCAT®, VARAN, POWERLINK® .– on page
181.
Commissioning. The following preconditions must be fulfilled before commissioning:
1 BM3200, BM3300 with VARAN is installed correctly.
n Ethernet connection cables are wired correctly.
2 The control cabinet is properly locked and all safety devices are operating.
3 The BM3200, BM3300 device is ready-to-use.
4 Create a Lasal-Class2 project using the driver classes for BM3200, BM3300 drives for
cyclic and service data communication.
5 Start the VARAN control
Address switch By means of the address switches S1 to S4 the IP-address is set
(See settings ZSetting the IP address with address switches– from page 67).
Parameters The parameter settings determine the behavior of the VARAN-Slave in operation. Param-
eters are set with the software ProDrive.
1 Start ProDrive
2 Click on „Project Tree“.
3 Communication settings with ProDrive
n Project Tree: Configuration/Fieldbus Slave
(refer also Parameter manual BM3200, BM3300)
m set Synchronization to „On“
m set Fieldbus cycle time according VARAN cycle time (1 ms, 2 ms, 4 ms or 8 ms)