EasyManua.ls Logo

CASE CONSTRUCTION CX145D SR - Page 298

CASE CONSTRUCTION CX145D SR
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-ACCESSORIES
Operationwiththehydrauliccrusher
Thehydraulicdemolitioncrusherisadouble-actinghydraulicattachment,andshallbeconnectedtoahigh-owhy-
drauliccircuit.
Therefore,tooperatewithahydrauliccrusherthemachineshallbeequippedwiththeDouble-actingauxiliaryhigh-ow
hydrauliccircuitorwiththeMulti-functionauxiliaryhigh-owhydrauliccircuit.
1.Makesurethatthemachineandtheattachmenttobe
installedareonatandlevelground.
2.Makesuretoreadandunderstandtheinstallationpro-
ceduredescribedintheOperator'sManualoftheat-
tachment.
3.Operatethecontrolsofboom,armandbucketinorder
toinstallthehydrauliccrushertothebucketlinkageat
thetopofthearm.
4.Stoptheengine.Releasepressureinsidetheauxiliary
high-owhydrauliccircuit.
5.Closethefeedvalvesatthetopofthearm.Install
theconnectinghosesbetweentheattachmentandthe
feedvalves.
6.Openthefeedvalvesandcheckthexingclampsfor
looseness,andthetubesandhosesttingsforleak-
ages.
7.Starttheengine.Pressandholdtheattachmentse-
lectorbuttonfor1stogetdirectlytothededicatedtab
foroperationalsettingsoftheauxiliaryhigh-owhy-
drauliccircuit.
SMIL14CEX1709AA30
8.Selectthecrusherpageandsettheproperowrate/
pressurecombination.
NOTICE:themaximumworkingpressureoftheauxiliary
high-owhydrauliccircuitshallbesetaccordingtothe
specicationofthecrusher.
NOTICE:theworkingpressureoftheDouble-actingaux-
iliaryhigh-owhydrauliccircuitshallbesetmanuallyby
theportreliefvalvesontherelevantsectionofthecontrol
valve.
SMIL15CEXZZ47AA31
9-20

Table of Contents

Related product manuals