EasyManua.ls Logo

Comtech EF Data CRS-300 - Utility: Switch-ID; Utility: Test; Utility: Relay

Comtech EF Data CRS-300
298 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CRS-300 1:10 Redundancy Switch MN/CRS300.IOM
Front Panel Operation Revision 19
6–22
6.2.6.3 UTILITY: SWITCH-ID
EDIT SWITCH ID:
**CRS-300 TEST MESSAGE**
To edit the Switch ID string: Use the arrow keys to select the cursor position on the
bottom line, and then use the arrow keys to edit the character in that position. You may
use the following characters:
[space] ( ) * + - , . / 0 through 9 and A through Z
A maximum of 24 characters are allowed. Press [ENT] when done.
6.2.6.4 UTILITY: TEST
This is an excellent method to test the whole system before setting the Switch for automatic
mode.
Once you select this screen, the Switch suspends normal system polling and initiates a test:
CONFIG TESTING.......2
TM#: 1 OK
TEST COMPLETE.
CHECK 2.
The total configuration of each activated modem is configured into the Redundant Modem in
sequence. If any configuration is not accepted, a fault will be shown on the display.
Press [ENT] or [CLR] to return to the top-level (main) menu.
6.2.6.5 UTILITY: RELAY
POWER-OFF RELAY LOGIC:
DEFAULT INVERT (ENT)
The alarm relay condition terms “Normally Open” and “Normally Closed” are easily
misinterpreted. To facilitate customer connection to existing external equipment, you may use
this menu to invert the logic of the external relay condition.
Use the arrow keys to select DEFAULT or INVERT, and then press [ENT].

Table of Contents