MAN MACHINE INTERFACE
306 PRS-7367
/Configuration /Authorization
User
(b)
User : Manuf
Password : ***
Type : Manufacture
Cancel
Login
/Configuration /Authorization
Engin_1
(a)
Manuf
Oper_1 Gust_1
Oper_2
Figure 7.3-27 Diagram of Authorization User (a) Operator Selection List (b) Login or Cancel
7.3.8 Test Information
This section is divided into three sub-parts. In this section user can check the testing accuracy of
relay like tripping test, signal test, operation test, warning test, block test, self-check test,
measurement test and mandatory wave etc. The overview display diagram of test information is
shown in below figure 7.3.28:
/ Test / Output Test
Output Test
Trip Test
Signal Test
Mandatory Wave
Mandatory Wave
Comm Test
Operation Test
Warning Test
Block Test
Selfchk Test
Measure Test
Status Test
Figure 7.3-28 Overview Display of Test Information Sub-functions
7.3.8.1 Output Test
Output test is divided into two sub-test like tripping test and signal test. See figure 7.3.27. User can
access this function through the following path: “Test > Output Test”.
1- Trip Test
In this section user can simulate different trip signal, but the tripping simulation can only be
conducted when the IED is under maintenance. see below figure 7.3.29 (a):
2- Signal Test
In this section user can simulate all kind of signal test like operation signal, alarm signal and signal
reset. see below figure 7.3.29 (b):