EasyManua.ls Logo

Dell Precision 7960 Tower - Installing the Ultraspeed Quad Solid-State Drive

Dell Precision 7960 Tower
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Steps
1. Push the PCIe latch to open the PCIe door.
2. Lift and remove the UltraSpeed Quad card away from the expansion-card slot.
3. Align and place the PCIe filler into the PCIe slot and close the PCIe latch.
Installing the UltraSpeed Quad solid-state drive
Prerequisites
If you are replacing a component, remove the existing component before performing the installation procedure.
About this task
The following image provides a visual representation of the UltraSpeed Quad solid-state drive installation procedure.
78
Removing and installing components

Table of Contents

Related product manuals