EasyManua.ls Logo

Dräger Fabius Tiro - Page 212

Dräger Fabius Tiro
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Annex
212 Instructions for use Fabius Tiro SW 3.n
Close the Air flow control valve. Open the
N
2O flow control valve completely. Check
whether the electronic N2O fresh-gas flow
display shows at least 10 L/min.
Check whether the float of the total flow
tube moves upward.
Shut off O
2 supply:
– Remove the O
2 connection of the cen-
tral gas supply.
– Close the O
2 cylinder valve.
– Check whether the red LED for low O
2
supply pressure is flashing.
–N
2O flow is interrupted.
Check whether the float of the total flow
tube shows 0 L/min.
Restore O
2 supply:
–N
2O flow is present.
Set the O
2 flow control valve to 1.5 L/min.
N
2O gas delivery = 3 L/min to 5 L/min.
Close the O
2 flow control valve:
–N
2O flow is interrupted.
Open the Air flow control valve. Check
whether the electronic Air fresh-gas flow
display shows at least 10 L/min.
Close all flow control valves.
Calibration of the sensors
Remove the O
2 sensor housing from the
cover of the inspiratory valve.
Expose the O
2 sensor to ambient air for
2 minutes.
Start the calibration.
Reinsert the O
2 sensor housing to the
cover of the inspiratory valve.
Calibrate the flow sensor
Check type of gas
Set the O
2 flow control valve to 3 L/min.
Check whether the measured O2 concen-
tration is at approx. 90 to 100 Vol%.
Close the O
2 flow control valve.
Vapor 19.n, Vapor 2000/3000 (Tec 5)
P Vaporizer is securely connected, locked,
and is hanging vertically.
P Control dial is in position 0.
P Filling level is between the minimum mark
and the maximum mark.
P Safety filling device:
– Sealing block is inserted and closed
tightly.
– Filling inlet is locked.
– Drainage valve closed.
P Filling device Quik Fil:
– Drainage valve closed.
– Sealing cap is tightly closed.
P Dräger Fill filling system:
– Drainage valve closed.
– Sealing cap is tightly closed.
D-Vapor (optional)
P Vaporizer is securely connected, locked
and is hanging vertically.
P Control dial is in position 0.
P Filling level is between the minimum mark
and maximum mark.
P Operation LED is lit.
Anesthetic vaporizers with Selectatec connec-
tion
P Vaporizer is securely connected, locked
and is hanging vertically.
P Control dial is in position 0.
P Filling level is between the minimum mark
and maximum mark.

Table of Contents