Fixing screws: 4 o M5 to ISO898-1 strength class 12.9 (nominal tensile
strength 1200 MPa)
Screw engagement length: 8 mm minimum
Fastening torque: 6 Nm (0.612 kgf.m)
Inlet connecon and pump orientaon
The pump can be securely xed to the vacuum system via the inlet ange. Do not operate the
pump in an
orientaon that is greater than horizontal.
CAUTION:
It is important that the pump be correctly orientated. The pump must only be orientated
in a horizontal or vercal posion. Incorrect orientaon may lead to premature pump
failure. Only store the pump such that the pump body is either horizontally in line with or
below the main inlet ange of the pump. If the pump is operated or stored at any me
with the pump body above the main inlet ange it is possible for oil - used to lubricate the
lower bearing - to escape from a reservoir at the base of the pump into the pump
mechanism or vacuum system. This may reduce performance and bearing life.
See Figure 2 on page 24 for allowable pump orientaon.
Make sure that the pump inlet and all components ed to the pump inlet are clean and dust-
free. If the pump inlet is not kept clean, the pump-down me may be increased.
The inlet connecons for the nEXT85 pumps are either ISO ange, CF ange or NW40 ange.
• If the pump has a CF ange, use the copper compression gasket supplied with the
pump and use a full complement of bolts to connect the inlet ange of the pump to
the vacuum system. A minimum grade screw of ISO898-1 class 5.6 (500 MPa tensile
strength) is recommended.
• If the pump has an ISO ange, use the Edwards combinaon inlet screen/trapped O-
ring supplied with the pump and use a minimum of four claw clamps (each torqued to
10 Nm) to connect the inlet ange of the pump to the vacuum system. Alternavely,
use a rotatable collar and the combined inlet screen and trapped O-ring supplied with
the pump to connect the inlet ange of the pump to the vacuum system; use a full
complement of minimum ISO class 5.6 bolts torqued to 10 Nm with the rotatable
collar.
• If the pump has an NW ange, use the centring ring supplied with the pump and a
metal NW clamp to connect the inlet ange of the pump to the vacuum system. In this
case, the base of the pump must also be xed to a rm support as described in Base
mounng on page 22.
All inlet ange bolts must be re-ghtened once the system is under vacuum. Ensure that no
torques or other forces are transmied to the pump from the vacuum system or the associated
pipelines.
B8G0-00-880A - Install the nEXT85
Page 23