59
www.factoryfive.com 508-291-3443
Tighten the balljoint using the arm for leverage with a Vice holding the ball joint.
Screw the grease fittings in to the ball joints and tighten with a ⅜” wrench.
If assembling a complete Coupe kit with the FFR spindles, skip to the next section.
Front upper control arm mounting with donor spindles
Mount the upper control arms to the chassis with the grease fittings pointed up. Use the mount holes
that are horizontal on the top of the 2”x 3” tube, not the side vertical ones. Torque the two bolts that
hold the arm to the frame to 135-149Nm (100-110 lbft).