EasyManua.ls Logo

FLIR BRICKSTREAM 3D Gen 2 - Installing a RAM Mount

FLIR BRICKSTREAM 3D Gen 2
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Brickstream® 3D Gen 2 Version 6.2
6/25/2021
©2016-2021 FLIR Integrated
Imaging Solutions Inc.
All rights reserved.
Brickstream® 3D Gen 2 Installation Guide
June 2021
97
Note: If you have additional self-adhesive foam tape, you
can optionally add a strip on the short perpendicular plane
to aid in alignment before inserting the screw assembly.
12. Place the assembled sensor and carrier into the mount and secure the mount in place.
13. Insert the recessed mount into the hole that was cut into the tile and backer board.
14. Connect the CAT5e Ethernet cable to the sensor.
Note: Ensure that a maintenance loop of at least 3 ft (or 1
m) is included in the CAT5e cable.
15. Confirm that the LEDs are blinking green, which indicates a network connection. See LED Boot
Sequence for detailed LED information.
16. Secure the mount to the tile with the provided hardware.
17. Review design details to confirm that the mounted sensor is oriented correctly relative to the
doors and/or entrance, and make any final adjustments to the position of the mount in the tile.
18. If necessary, adjust the tilt of the sensor in the mount using the screw and degree markings on
the mount.
19. If required, contact the Remote Support team to confirm that the sensor is online and displaying
the correct field of view.
20. Attach the extra label (if provided) to the outer surface of mount for future support and
troubleshooting purposes.
Installing a RAM Mount
Note: FLIRdoes not sell RAM mounts.
Installing Brickstream 3D Gen 2 in an open ceiling requires pole drops to install the sensors at the
designed height, typically 4.2m (13ft 9in.) Above Finished Floor (AFF). Brickstream offers proprietary
mounts for surface and recessed installations; however, open-ceiling mounting can use common
hardware parts standard to the industry that conform to each client's requirements and match the
current infrastructure. The installation partner is responsible for:
n Identifying and obtaining materials used to install 3D Gen 2
n Ensuring that local construction codes and safety procedures are followed