Rev. AV Page 16-28
1111
4
1010
8
1212
4
1515
4
C
C
3.30
SEE NOTE 3SEE NOTE 3
CONTROL STICK SHOWN IN NEUTRAL POSITIONCONTROL STICK SHOWN IN NEUTRAL POSITION
NOTES:NOTES:
ATTACH MOUNTING BRACKET TO FLOOR AS SHOWN USING SUPPORT PLATE WITH #8 FLAT HEADATTACH MOUNTING BRACKET TO FLOOR AS SHOWN USING SUPPORT PLATE WITH #8 FLAT HEAD
1.1.
SCREWS, WASHERS, AND NUTS PROVIDED OR USE MS21055 CORNER NUT PLATES (NOT INCLUDED).SCREWS, WASHERS, AND NUTS PROVIDED OR USE MS21055 CORNER NUT PLATES (NOT INCLUDED).
MATCH DRILL THROUGH FLOOR FOR #8 SCREWS ONCE BRACKET LOCATION HAS BEEN DETERMINED.MATCH DRILL THROUGH FLOOR FOR #8 SCREWS ONCE BRACKET LOCATION HAS BEEN DETERMINED.
2.2.
DIMENSION SHOWN IS APPROXIMATE. IT IS HIGHLY RECOMMENDED SERVO WITH BRACKET AND DIMENSION SHOWN IS APPROXIMATE. IT IS HIGHLY RECOMMENDED SERVO WITH BRACKET AND
3.3.
PUSH ROD ARE PLACED THEN INTERFERENCE AND FREEDOM OF MOTION ARE VERIFIED PRIOR TO PUSH ROD ARE PLACED THEN INTERFERENCE AND FREEDOM OF MOTION ARE VERIFIED PRIOR TO
DRILLING MOUNTING HOLES THROUGH FLOOR.DRILLING MOUNTING HOLES THROUGH FLOOR.
PUSH TUBE CLEARANCE HOLES IN FLOOR RIBS MAY NEED TO BE TRIMMED TO CREATE MORE PUSH TUBE CLEARANCE HOLES IN FLOOR RIBS MAY NEED TO BE TRIMMED TO CREATE MORE
4.4.
CLEARANCE FOR SERVO PUSH ROD.CLEARANCE FOR SERVO PUSH ROD.