EasyManuals Logo

GE Senographe DS User Manual

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #1349 background imageLoading...
Page #1349 background image
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job card D/R A258 - Bucky Board
Page no. 1349 Chapter 9
JC-DR-A-258.fm
allen wrench).
3. Remove the faulty Bucky board by carefully sliding it upwards to the lefthand side away from the
Bucky, being careful not to damage the metal arm (5) connected to the Bucky.
4. Insert the new Bucky board from the left hand side, by carefully sliding it downwards to into the
Bucky. When inserting the Bucky board be careful to ensure that the metal arm (5) connected to the
Bucky passes in between the optical fork on the Bucky board.
5. Use the four allen screws and washers (4) secure the Bucky board to the Bucky (2.5 mm allen
wrench).
6. Carefully connect the Bucky connector cables (1 and 2) and Bucky motor cable (3) to the new Bucky
board.
Note:
The connectors on the Bucky connector cable and Bucky motor cable are fragile. Ensure you take
care not to break them when connecting them to the new Bucky board.

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals