Chapter 9 Page no. 1732
JC-CHK-A-001.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card CHK A001 - Boot/Init and Shutdown
8 POWER UP SEQUENCE CHECKS
Remove Generator Cabinet covers as required for access to the main circuit breaker in the MDR, the
Generator circuit breaker, the Conditioner, and to the pushbuttons controlling power to the Conditioner
and the Detector.
8-1 Preliminary Power-Up sequence check
Start this sequence with the MDR and Generator circuit breakers switched OFF (as described for the
Complete power OFF state checks above).
1. Switch the Generator circuit breaker ON.
2. Switch the MDR circuit breaker ON.
3. Press the Control Station ON button on the Generator Cabinet; The button
lights and power is supplied to the Control Station; check by switching the
Light Box on.
4. Press the CONDITIONER ON push button at the top of the MDR; the button
lights and the Conditioner starts.
5. Press the UPS ON push-button on the Generator Cabinet for at least one sec-
ond; the AWS starts up (see VF Job Card UPS Battery if you suspect a prob-
lem with the UPS).
6. The Login
prompt appears on the AWS monitor within 90 seconds of switch-
on. At the Login: prompt, enter sdc. At the Password prompt, press the
<Return> key. The browser application begins to load and the AWS login sceen appears.
!
Notice:
At this point of the sequence, communication errors between AWS and the Senographe will appear
because the Senographe is not yet switched ON. This is normal and does not imply any problem.
7. Press the GANTRY ON push-button in the MDR; the button lights.
8. Press the GANTRY OFF push-button in the MDR; the light goes out.
9. Shut the system down by clicking the System Off button on the Browser window; wait for com-
plete shut down.
The system is now in the normal switched-off state, ready for the normal power up sequence (below).
NOT OKOK

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals